Bevel End Seamless Pipe
One-Minute Overview
- Seamless pipe delivered with weld bevels already cut on both ends.
- Bevel angle 30 degrees per ASME B16.25, with compound bevels on thick walls.
- Sizes 1/2 to 24 inch, schedules Sch 40 to XXS, carbon and alloy grades.
- Protected with end caps so the bevel face survives shipping and storage.
A bevel end seamless pipe leaves the mill ready to butt weld. The end is machined to a weld preparation — usually a 30-degree bevel with a small land, per ASME B16.25 — so the welder fits up without cutting the prep in the field. On heavy wall schedules the bevel goes compound, with a steeper second angle, so the root pass is deposited in controlled beads instead of one oversized pour. Carbon and alloy grades are available, from general line pipe grades to chrome-moly for hot service. Sizes run 1/2 to 24 inch, Sch 40 to XXS.
Name: Bevel End Seamless Pipe
Type: Seamless
Size: 1/2-24 Inch
Schedule: Sch 40-XXS
Material: Carbon steel and alloy steel grades
Standard: ASME B16.25 / ASTM A106 / ASTM A335
End: Bevel End, 30 degrees per ASME B16.25
Feature: Weld-ready ends, protected with caps
Sizes, wall thicknesses and schedules are confirmed per inquiry, and a detailed specification sheet is available on request.
Bevel geometry is what makes fit-up fast. The standard 30-degree angle, a root face of a couple of millimetres and a clean land give the welder a gap he can control. Mismatched OD and a bellied bevel are the usual complaints, so check the first and last pipe of every bundle. On thick walls, order the compound bevel your welding procedure expects; a straight bevel on a heavy wall forces a wide groove and a slow, expensive fill.
Protect the faces. Bevels travel with plastic caps and end protectors because a chipped or rusted bevel means grinding before every weld. Store the pipe capped and off the ground, keep alloy grades segregated and dry, and weld with the preheat and consumables the grade requires. Where the code asks for it, add radiographic or ultrasonic examination to the butt welds and keep the traceability chain — heat number on the pipe, weld map on the spool — intact from goods receipt to hydrotest.
FAQ
Q1. What bevel preparation does ASME B16.25 define?
Q2. Why pay for factory bevels instead of cutting them on site?
Q3. What usually ruins a perfectly good bevel end?
Q4. What's the minimum I can order?
Send Message
Comprehensive score