A335 P11 SMLS Pipe
One-Minute Overview
- Seamless chrome-moly pipe in ASTM A335 Grade P11 for elevated-temperature process service.
- Sizes 1/2 to 24 inch, wall schedules Sch 40 to XXS, cut to length on request.
- Hot finished or cold drawn, with plain or bevelled ends and full material certification.
- A common choice for refinery piping, heater tubes and moderate steam service.
A335 P11 SMLS pipe sits in the middle of the chrome-moly family: 1.25% chromium and 0.5% molybdenum give it more creep resistance and oxidation tolerance than carbon steel, without the cost and the welding discipline of the heavier grades. Engineers pick P11 for refinery process lines, convection heater tubes, transfer lines and steam piping where the metal temperature stays moderate. The pipe is made seamless to ASTM A335 / ASME SA335, supplied normalized and tempered, and marked with heat number, grade and size so every length can be traced back to its mill test report.
Name: A335 P11 SMLS Pipe
Type: Seamless, hot finished or cold drawn
Size: 1/2-24 Inch
Schedule: Sch 40-XXS
Material: ASTM A335 P11 (1.25Cr-0.5Mo)
Standard: ASTM A335 / ASME SA335
End: Plain End or Bevel End
Feature: Normalized and tempered, traceable heat marking
Sizes, wall thicknesses and schedules are confirmed per inquiry, and a detailed specification sheet is available on request.
Choosing between P11, P22 and carbon steel is mostly a temperature question. Below the creep range, carbon steel does the job; once metal temperatures climb and oxidation starts to eat the wall, P11 earns its place; higher still, P22 or P91 take over. P11 also welds more easily than the heavier chrome grades — preheat and post-weld heat treatment are still part of the procedure, but the window is more forgiving. Send the design temperature, the corrosion allowance and the code, and the grade can be fixed before the first length is cut.
Inspection and handling keep that grade honest. Check the heat number on every length against the mill test report, confirm the wall thickness at both ends, and store the pipe on dunnage with the ends capped so moisture and grit stay out. Bevels should arrive protected and undamaged; a nicked bevel costs more fit-up time than it saves in freight. For lethal or high-pressure services, add the non-destructive examination your code requires — ultrasonic, radiographic or magnetic particle — before fabrication starts.
FAQ
Q1. When is P11 the right grade rather than P22 or carbon steel?
Q2. Can I weld P11 like carbon steel and skip the paperwork?
Q3. Will my tubes show up as a mystery pile of steel?
Q4. What's the minimum I can order?
Send Message
Comprehensive score