0
KLINGERSIL C4400 Insulation Gasket
KLINGERSIL C4400 Insulation Gasket
KLINGERSIL C4400 Insulation Gasket
KLINGERSIL C4400 Insulation Gasket

KLINGERSIL C4400 Insulation Gasket

QS Gasket: KLINGERSIL C4400 Insulation Gasket
Name: KLINGERSIL C4400 Insulation Gasket
Standard: ASME B16.5
Material: Klingersil C4400
Max Temperature: 400℃
Size: 4 Inch
Pressure: 150LB
Complete Set: with G10 Sleeve and Washers and ZPS
Compound: with Aramid Fiber Reinforced with a Nitrile Binder
Quantity
Contact Now
add to cart
KLINGERSIL C4400 Insulation Gasket (4"150LB) is an aramid-fibre / NBR composite rated to 400 °C, supplied with a G10 insulating sleeve and ZPS set, ASME B16.5 certified. It delivers long-term sealing plus electrical isolation for high-pressure flanges, installs easily, extends service life by 30 %, and is ideal for severe services in petrochemical, power and marine industries.
 
What must be watched during installation?  
The “Seven-Step” Gasket Procedure – drive leak probability to zero.
1. Shut-down & de-pressurisation  
Verify “zero pressure, zero temperature, zero charge”; lock and tag all valves.
 
2. Surface inspection  
Examine flange faces with 30° grazing light plus fingertip feel:  
- no radial scratches, burrs or pits > 0.1 mm  
- flatness ≤ 0.2 mm / 100 mm  
Non-conforming faces must be re-machined or the flange replaced; angle-grinder “patching” is forbidden.  
(KLINGERSIL C4400 Insulation Gasket demands extremely smooth sealing surfaces.)
 
3. Select correct fasteners  
Recalculate bolt torque for KLINGERSIL C4400 Insulation Gasket insulation set using the official K-factor 0.15 and friction coefficient 0.12; never copy carbon-steel-gasket torque tables. Coat threads with high-temperature anti-seize free of metallic particles.
 
4. Dry pre-assembly & positioning  
- Slide G10 sleeve onto the bolt; ensure exposed length > two threads above the nut.  
- Orient KLINGERSIL C4400 Insulation Gasket “label side out”, centre on the pipe axis; never force. If resistance is high, check for distorted flange register.
 
5. Criss-cross simultaneous tightening  
① 30 % final torque → ② 60 % → ③ 100 % → ④ 100 % re-check  
Each increment ≤ 15 N·m; use synchronous wrenches or dual guns working diagonally, keeping scatter ≤ 5 %.  
When service temperature > 150 °C, perform a hot re-torque within 4 h of start-up.  
(KLINGERSIL C4400 Insulation Gasket must maintain constant gasket stress even at high temperature.)
 
6. Electrical isolation test  
After tightening, measure flange-to-flange resistance with 500 V DC megger; reading must be ≥ 10 MΩ. If lower, disassemble and inspect G10 sleeve / KLINGERSIL C4400 Insulation Gasket for cracks or metallic bridging.
 
7. Documentation & re-torque  
Record torque, resistance and ambient temperature. After three heat-up / cool-down cycles, re-check 100 % torque within 72 h. Photograph and upload to the CMMS to generate a QR-code “gasket ID” for traceability at the next overhaul.  
(Scan the code to retrieve KLINGERSIL C4400 Insulation Gasket batch, torque, resistance and full life-cycle data.)
 
Do it right once – it costs 100× less than a weld repair later.